Fuerteventura, Spain
Elaboration of the draft project, basic project and execution project for the Multifunctional Building in the Parque Tecnológico Fuerteventura. The project has been the result of a joint venture with BOISSIER ARQUITECTOS and AJN INGENIEROS.
A 3-level building is designed, whose workspaces and rooms orbit around a large lobby, conceived as the lung of the building.
![01](https://slabconsultants.com/wp-content/uploads/2023/10/01-4.jpg)
![02](https://slabconsultants.com/wp-content/uploads/2023/10/02-4.jpg)
![03](https://slabconsultants.com/wp-content/uploads/2023/10/03-4.jpg)
![04](https://slabconsultants.com/wp-content/uploads/2023/10/04-4.jpg)
![06](https://slabconsultants.com/wp-content/uploads/2023/10/06-3.jpg)
![07](https://slabconsultants.com/wp-content/uploads/2023/10/07-1.jpg)
- CLIENT: PARQUE TECNOLÓGICO DE FUERTEVENTURA S.A.
- STAGE: DRAFTING OF BASIC AND EXECUTION PROJECT.
- SCOPE OF WORKS: COLLABORATION OF STRUCTURES
- BUDGET FOR CONTRACTUAL IMPLEMENTATION: > € 8,000,000