ES / EN / DE

Las Palmas de Gran Canaria, Gran Canaria, Spain

  

Project for an apartment block with more than 200 dwellings to be built. The intervention is divided into three stages, the first of which consists of 125 apartments, distributed across 8 storeys above ground. Stage I also includes up to 4 levels underground, dedicated to parking lots. 

01

02

03

04

05

06

  • CLIENT: GRUPO FÉLIX SANTIAGO MELIÁN.
  • STAGE: DRAFTING OF BASIC AND EXECUTION PROJECT.
  • SCOPE OF WORKS: ALL STAGES OF DESIGN.
  • CONSTRUCTION BUDGET: > € 6,500,000 (STAGE I)

S.LAB CONSULTANTS

 

 

Av. Rafael Cabrera, 18 – 5ºD

35002 – Las Palmas de Gran Canaria

España

Política de Privacidad Política de Cookies

© 2023 S.LAB CONSULTANTS, TODOS LOS DERECHOS RESERVADOS

CONTACTO

+34 828 664 934

info@slabconsultants.com

www.slabconsultants.com

PROGRAMA KIT DIGITAL COFINANCIADO POR LOS FONDOS NEXT GENERATION (EU) DEL MECANISMO DE RECUPERACIÓN Y RESILIENCIA